Rampura Agucha Decline & Deep Shafts
Turnkey development of ultra-deep underground twin ramp system and a 1,000-meter deep vertical production hoisting shaft in intensely jointed metamorphic rock formations with zero-tolerance alignment.
Explore selected mining, exploration and mine-equipping assignments from MMPL’s published project register. The mining and exploration listings below refer to FY 2022–23, rather than current contract status.
Turnkey development of ultra-deep underground twin ramp system and a 1,000-meter deep vertical production hoisting shaft in intensely jointed metamorphic rock formations with zero-tolerance alignment.
Complex shaft drivage and inset construction through high-pressure water horizons and Degree-III gassy coal measures, followed by mechanical hoist commission and armored face conveyor integration.
Executing the critical transition from open-pit to large-scale underground trackless block sublevel stoping, constructing south decline gradients, ore passes, and massive crusher chamber cavities.
Erection of structural steel A-frame headframes, multi-rope friction hoisting winders, shaft steelwork furnishing (buntons, rigid guides, pipes), and automatic skip loading measuring flasks.
Continuous high-recovery diamond core drilling campaign across Gondwana basin strata to delineate deep seams, involving geophysical down-hole logging and geotechnical rock mass rating index.
Sub-vertical internal winze sinking, station breakthrough, and cross-cut drivage into ultra-deep gold reef structures under high geothermal gradient and heavy rock-burst prone conditions.